Despite the rain and cold the second floor loft is taking shape. Some sheathing is going on and the carpenters are talking about possibly having a roof by Friday. Seems optimistic to me. :)
Wednesday, May 12, 2010
5/12 Second Floor Work
Monday, May 10, 2010
5/10 - Quick update
We were up at the house all day on Saturday. Kristin was able to get an actual feel for the space which has led her to make several changes in the first floor layout. This will give us more room in the kitchen and some better trim options for the kitchen window. hThe carpenters will be implementing the changes today.
More pictures and updates on Wednesday since I am traveling this week.
Thursday, May 6, 2010
5/6 First Floor walls complete
Kent and Trevor finished framing the first floor walls today. They are off tomorow, and will be back on Monday to continue. King Bros concrete will be back tomorrow morning to pour the basement floor and footers for the porch posts, then their work is done. Our first big check is being written to them......ouch!!
We are really excited since its actually starting to look like a house.
Wednesday, May 5, 2010
5/5 More Framing and basement work
Today the framers decked the first floor and stood up the north and south walls. The walls are not pictured since I left the job site before that happened. I took the day off from work and spent the day prepping the basement for Friday's pour. I placed a vapor barrier, 2 inches of rigid foam, steel re enforcing mesh, and PEX tubing (the red stuff). The PEX will be used to heat the concrete floor with water heated by the wood stove, sort of like a large heat sink.
Tuesday, May 4, 2010
5/4 Framing begins
Today the first lumber deliverly arrived and Garrision construction started the framing. Flooring framing was completed and it will be decked tomorrow. First mistake, I am sure there will be more, was noticed. Grey should not have insulated the concrete cellar entrance as we plan to use some of this area as a root cellar. Grey (I) will be fixing this tomorrow.
Sunday, May 2, 2010
5/2 - Foundation Insulation
We did not go to the site at all on Saturday. The boys school had a May Faire and we had friends over for dinner. Today, however, we worked at the site most of the day. After King Bros stripped the forms on friday they applied a waterproofing, aka tar, to the outside of the foundation. We spent the day putting 2 inch rigid foam insulation over the tar. Not only does it protect the waterproofing, but it adds substantial insulation and a thermal break to the concrete walls. This makes the interior dry and warm. Our other scheduled job, prep the floor with insulation and a vapor barrier before pouring concrete over it, is postponed until later this week due to the possibility of rain
Our friend Andy and his son Mateo spent the day helping. All three boys assisted with bringing over sheets of foam and fresh tubes of glue when they weren't playing on the digger left by the excavators.
Friday, April 30, 2010
4/30 Wall forms stripped
Just a quick update. We did not make it out the site today, but we received a couple third party reports. Our friend Andy stopped up in the morning and King Bros were stripping the forms. So it looks like we have an actual foundation. Kent Garrison, the framer, stopped at the site in the late afternoon. All the forms were stripped and the foam insulation for the foundation had been delivered. Our first of many deliveries from Baker-Miller Lumber, a local lumber yard with fantastic customer service. Tomorrow is Eli and Asa's school May Faire, so no work. However, Sunday we will be putting foam on the foundation walls so it is ready for back fill on Monday.