Looking out the basement windows.
Friday, May 28, 2010
Thursday, May 27, 2010
5/28 - Deck Framing & Entry way
Sorry for not posting in several days. I was traveling. I hope the extra pictures and the video make up for it.
Progress now is not as aparent as it was in the first weeks. Exterior sheeting is complete, the roof is decked,and sky lights are installed. The windows and doors should be here any day now. Framing of the deck is complete and the screened porch framing material (locally milled larch) has arrived. The flooring for the porch also be local Larch, but that has to be kiln dried to reduce shrinkage, so it is about 3 weeks out.
Progress now is not as aparent as it was in the first weeks. Exterior sheeting is complete, the roof is decked,and sky lights are installed. The windows and doors should be here any day now. Framing of the deck is complete and the screened porch framing material (locally milled larch) has arrived. The flooring for the porch also be local Larch, but that has to be kiln dried to reduce shrinkage, so it is about 3 weeks out.
Looking east at entry way (w/o roof).
Subscribe to:
Posts (Atom)