Grandma B and Grandpa Jim bought the boys a 150 foot zip line. We just installed it last week. Its really fun!!
Thursday, September 8, 2011
Monday, September 5, 2011
9/5 - Sofits and Facia
The past week I have been busy on the sofits (space under the eves) and facia (face of the eve). The sofit material is 1/4 inch maple plywood attached with stainless steel screws. The facia is locally milled pine.
8/27/11 - Siding work & drywall finish continues
Metal siding to cover exposed foundation is complete (pictures below). We have also been slowly working on finishing the drywall and building the shower stall.
Subscribe to:
Posts (Atom)