Monday, April 30, 2012

4/30/12 - Built-ins and general update

I apologize for such a long gap since our last post.  Much has been done:  Water heater installed, mudroom tiled and grouted, bath room tiled and grouted, Kitchen almost completed, and work on built-ins.  We also had our well water tested and it passed with flying colors.

Its important to note that Kristin has taken on the job of building and installing all the cubbies, shelving, and benches.  As you can see from the picture below the built-in are simple but beautiful and really fit into the theme of the house.  I never knew Kristin was such a good carpenter.  

Mudroom with cubbies, shelf, and coat hooks.  Note tile at edge of card board.
Boys room shelving and closet.
Bathroom sink with built-in shelving and hanging light.
First component of a 3 component bench system for dining area.  The other 2 components will be along the far wall.