Thursday, April 21, 2011

4/21/11 - More Interior Walls

Its spring break week so Kristin and the kids have been in Florida visiting her parents. I have been able to get a bunch of pine put up. The entire ceiling, along with with the skylight jambs, is done. Additionally the North wall of the loft is done. All that remains of the pine work is the downstairs South wall and the mudroom, which will be all pine.


Main room ceiling looking into loft

North wall of the loft
North wall loft (kids room)