Tuesday, May 29, 2012
5/29/12 - Wood railing up stairs
Kristin wanted wood/log railings around the stair opening and on the balcony. I completed the stair railing this weekend using ash from our forest. Interesting note: I learned this skill while working for a log home company in Steamboat Springs CO. So those 2 years of ski bumming were not completely with out education. These railings will continue around the rest of the balcony.
Add caption |
5/29/12 - Kitchen Update
The kitchen is nearly complete. Kristin tiled the counter top and back splash and I installed the sink along with the butcher block counter tops. I also installed a custom designed kitchen fan and Kristin constructed the shelving around it and a plywood housing for the ducting. We will be removing the blue protective cabinet coverings this weekend. Only a couple punch list items and we can call the kitchen done!
Tiled portion of the counter top (at 38 inches) the butcher block portion (at 36 inches) |
The guts of the kitchen venting system. |
The shelving and duct housing. |
5/29/12 - Built-in's complete (mostly)