Tuesday, May 29, 2012

5/29/12 - Kitchen Update

The kitchen is nearly complete.  Kristin tiled the counter top and back splash and I installed the sink along with the butcher block counter tops.  I also installed a custom designed kitchen fan and Kristin constructed the shelving around it and a plywood housing for the ducting.  We will be removing the blue protective cabinet coverings this weekend.  Only a couple punch list items and we can call the kitchen done!
Tiled portion of the counter top (at 38 inches) the butcher block portion (at 36 inches)
The guts of the kitchen venting system.
The shelving and duct housing.