5/5 More Framing and basement work



Today the framers decked the first floor and stood up the north and south walls. The walls are not pictured since I left the job site before that happened. I took the day off from work and spent the day prepping the basement for Friday's pour. I placed a vapor barrier, 2 inches of rigid foam, steel re enforcing mesh, and PEX tubing (the red stuff). The PEX will be used to heat the concrete floor with water heated by the wood stove, sort of like a large heat sink.

No comments: