I finished siding the entry-way bump out today. We are using finish grade maple plywood treated with a weather resistant oil. The horizontal joints have an exposed metal flashing strip that is the same color as the roof (see detail photo below). Exposed screws are used to attached the panels. This type of siding will continue around the south side of the house and stop at the screened in porch. The rest of the house will be ship lap pine boards.
Saturday, October 1, 2011
Thursday, September 8, 2011
9/1 - ZIP LINE!!!
Grandma B and Grandpa Jim bought the boys a 150 foot zip line. We just installed it last week. Its really fun!!
Monday, September 5, 2011
9/5 - Sofits and Facia
The past week I have been busy on the sofits (space under the eves) and facia (face of the eve). The sofit material is 1/4 inch maple plywood attached with stainless steel screws. The facia is locally milled pine.
8/27/11 - Siding work & drywall finish continues
Metal siding to cover exposed foundation is complete (pictures below). We have also been slowly working on finishing the drywall and building the shower stall.
Wednesday, July 27, 2011
7/26 - Drywall hanging complete
I have finished hanging all the drywall. Kristin's parents have finished the the drywall upstairs and some down. Kristin is going to tackle the rest. I am now moving to the outside of the house to work on siding.
| Drywalled kitchen |
| Super steep basement stairs. |
Friday, June 3, 2011
5/3/11 - More drywall and plywood
Tuesday, May 17, 2011
5/16/11 - Drywall and Plywood
Now that the toungue and groove pine is done we are starting on drywall and plywood. The east and west walls along with most interior walls will be drywall. The loft wall, both sides, and the ceiling under the loft will have finish grade maple plywood.
| Finish grade maple plywood going on loft wall |
| Drywall in kids room |