Wednesday, July 27, 2011

7/26 - Drywall hanging complete

I have finished hanging all the drywall.  Kristin's parents have finished the the drywall upstairs and some down.  Kristin is going to tackle the rest.  I am now moving to the outside of the house to work on siding.

Drywalled kitchen
I also built permanent stairs to the basement.  It is so much nicer then using the ladder that has been there for a year.
Super steep basement stairs.
The start of the siding.  The exposed basement will be covered with the same material we used for the roof.  The wall will get a mixture of finish grade plywood and pine siding.


No comments:

Post a Comment