We have started putting the kitchen together. Kristin recently made an Epic 1 day road trip to Ikea in Philadelphia and returned with a pickup truck full of cabinets (and other stuff). I built the toe kicks and she has put all the boxes together. We are both really happy with the way the kitchen is laying out. At this point we are on hold until the refrigerator arrives. I also wanted to finish the stairs and get the plumbing inspection before we focused on the kitchen.
Monday, February 13, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment