Sunday, April 10, 2011
4/10/11 - Interior Walls
Sunday, March 13, 2011
3/12/11 - Jamb Extenstions
Using the pocket hole jig
In this video I have a horizontal component of a window jamb extension. I am using the jig to drill a series of angled pilot holes in the backside of the extension. I will then attach this piece to 2 vertical jamb extensions and another horizontal piece (using pocket screws). This will result in a 'picture frame' box that has the exact dimensions of the window. This box will be aligned with the existing factory jamb, glue is applied between the two, and pocket screws are inserted in the pre-drilled holes on the back side of the extensions and screwed in.
3/12/11 - Insulation inspection complete
Wednesday, February 9, 2011
2/9/11 - Side wall insulation
2/6/11 - Rough Plumbing complete
Monday, January 3, 2011
1/3/10 - Side Wall Insulation
This method requires stapling a special netting material very tightly across the studs. Then the insulation is blown between the netting and the exterior sheathing. This will allow us better visibility to ensure we achieve the proper insulation density. Eli operating the stapler, hey where's that kids ear protection. This process has just started and the upstairs is almost complete. Insulation won't happen for another couple weeks.