I took the day off work today. Our friend Andy, Kristin, and I worked on insulation for the entire day. Now that the rough plumbing and electrical are complete and all the insulation mesh is up (nice work Kristin) we can get serious about the insulation. Its dusty and dirty but fairly rewarding. Each stud bay is injected with cellulose until it feels like a firm mattress.
Wednesday, February 9, 2011
2/6/11 - Rough Plumbing complete
The rough plumbing is finally done. All waste piping and supply piping is complete (even though we don't have a well yet). Now its full-on side wall insulation time. The blue and red pipes are supply lines. They are a material called PEX (cross linked polyethylene). It bends so no elbows or soldering are required. Great for a novice plumbing like me.
Monday, January 3, 2011
1/3/10 - Side Wall Insulation
We will be using dense pack cellulose for the wall insulation. Although the R value per inch is lower (R=3.5) then spray foam (R=6) it is much more environmentally friendly. It is 85% recycled newspaper (the average house will contain about 40 years worth or newspapers) and 15% Borate (a naturally occurring chemical that imparts mold, insect, and fire resistance/retardant properties).
This method requires stapling a special netting material very tightly across the studs. Then the insulation is blown between the netting and the exterior sheathing. This will allow us better visibility to ensure we achieve the proper insulation density. Eli operating the stapler, hey where's that kids ear protection. This process has just started and the upstairs is almost complete. Insulation won't happen for another couple weeks.
1/3/10 - Plumbing Rough-In
The plumbing rough-in is currently in progress. I have completed the waste piping and venting, which had to get done before the spray foam insulation. I have started the supply lines and should have those done in the next week or so. Sorry no pics right now.
1/3/10 - Roof Deck Insulation
In early December we had closed cell spray foam insulation applied to the roof, under the entry and bedroom bump-out which over hang the foundation, and on the rim joist. Although not the most environmentally friendly insulation it was a good choice for this roof. It not only provides high R value per inch, but creates an effective moisture barrier for our un-vented roof with big sky lights (always a leak potential).
1/3 - Electrical Rough In Complete
1/3/2011 - New years resolution......
.....is to update this blog on a weekly basis. Sorry to all (5 of you) who have been following this blog only to see no posts for the last 2+ months. I will catch everyone up in the following posts.
Thanks for you patience.
Subscribe to: